Pre-engineered control room buildings, e-houses, and modular electrical enclosures for oil & gas, power generation, mining, and data centers. Delivered in 12–16 weeks — not 12–14 months.
Every modular control room is purpose-built for the specific codes, hazards, and operating conditions of your industry.
Hazardous-area-rated control rooms for upstream production, midstream compression stations, and downstream refining. Designed to meet NFPA 496 pressurization, Class I Division 2 electrical classifications, and API RP 752/753 blast resistance standards.
E-houses and electrical buildings for substations, solar farms, wind parks, and combined-cycle plants. Pre-integrated switchgear, MCC, and SCADA systems reduce on-site commissioning from months to days.
Ruggedized modular control rooms for open-pit mines, mineral processing plants, and remote extraction sites. Engineered for extreme temperatures, high altitudes, dust, and vibration in some of the harshest operating environments on earth.
Modular electrical rooms and control enclosures for edge data centers, colocation facilities, and telecom switching stations. Factory-built modules with precision cooling and redundant power distribution arrive ready to connect.

Built Indoors. Tested Indoors. Delivered Ready.
Factory-controlled conditions eliminate weather delays, improve weld quality, and enable parallel construction with your site work.
Modular control rooms aren't a compromise — they're an upgrade over conventional stick-built construction in cost, quality, and schedule.
Factory fabrication runs parallel to site preparation. While foundations cure, your control room is being built, wired, and tested indoors. Typical delivery: 12–16 weeks vs. 9–14 months for conventional construction.
Every weld, cable termination, and equipment mount is inspected in a controlled environment — not on a muddy job site. Factory builds consistently exceed field construction quality with full traceability from raw steel to final test.
Complete factory acceptance testing (FAT) with your engineers present. Electrical systems, HVAC, fire suppression, lighting, and communications are all powered up and proven before the building leaves the plant.
Modular control rooms are a capital equipment purchase — not a permanent structure. When the project ends or operations move, your control room moves with you. Re-deploy to a new site in weeks, not months.
Every modular control room is engineered to order. These are the standard capabilities — custom configurations available for any application.

A proven delivery process that keeps your project on schedule and under budget.
Site survey, hazard classification, and detailed 3D engineering. All drawings stamped by a licensed PE.
Steel cutting, welding, coating, and equipment installation in our climate-controlled factory.
Factory Acceptance Test (FAT) — electrical, mechanical, fire suppression, and HVAC systems proven before shipping.
Turnkey delivery to your site by truck, barge, or helicopter. Set, connect, commission — operational in days.
Tell us about your project and we'll connect you with modular control room manufacturers who can meet your requirements and timeline.